A geometric pool, a raised spa and 1,400 square feet of travertine — how four weeks of preparation decide sixteen weeks of construction.
Before a single yard of soil moves, we shoot the grade. The pool you see from the kitchen window is set by a laser level and a string line, not by eye. On this build the homeowner wanted the water to disappear into the horizon from the covered patio, which meant dropping the beam six inches and rebuilding the deck slope so runoff still moved away from the house.
The shell is only half the story. Coping is cut from the same travertine lot as the deck so the tones match in every light, and it is set with a consistent joint so the grout reads as a line rather than a gap. Waterline tile is laid to a story pole so the last course meets the coping at exactly the same height all the way around — the mistake that makes a new pool look dated fast.
Equipment lives behind a screen wall instead of beside the house: a variable-speed pump dialed to the lowest setting that still turns the water over twice a day, a cartridge filter, and LED lighting placed to graze the water rather than glare off it. It is quieter, cheaper to run, and it lets the yard stay the thing you notice.
The last week is the slowest. The interior finish is hand-troweled, the pool fills from a hose over two days rather than a truck, and start-up chemistry is balanced before anyone swims. It is unglamorous work, and it is the reason the coping still looks new five summers later.